Avi Davi Builders coordinates kitchen remodeling across Broward, Miami-Dade and Palm Beach counties. From Fort Lauderdale and Dania Beach to Miami and Boca Raton, we connect cabinets, appliances, countertops, lighting and installation around one agreed plan before your kitchen is taken apart.

Discuss your project Contact Avi DaviInquiries opening soon

What the scope can include

Kitchen remodeling, coordinated beyond the visible finish.

A kitchen renovation brings layout, cabinets, appliances and finishes into one scope. Dimensions and responsibilities need to be resolved before work begins, so cabinet installation, plumbing, electrical work and countertop fabrication follow an agreed sequence.

  • Layout and workflow review
  • Cabinet, appliance, countertop, and backsplash coordination
  • Plumbing, electrical, ventilation, and lighting trade sequencing
  • Demolition, substrate preparation, flooring, and finish work
  • Delivery, protection, installation, and punch-list scheduling
  • Permit and inspection coordination when the scope requires it
Interiors with room to live.
Avi Davi · Selected gallery

See our work

Interiors with room to live.

Explore kitchens, living spaces, and interior details from Avi Davi’s existing gallery.

View interiors

Planning your own renovation?

Start with the property location, rooms involved, priorities, and target timing. Our preliminary estimator helps frame the conversation; a final proposal depends on the property and agreed scope.

Start my preliminary estimate

Preconstruction focus

Every dimension has a downstream effect.

Cabinet drawings affect appliance clearances. Appliance specifications affect power, gas, plumbing, and ventilation. Countertop fabrication depends on installed cabinets. Lighting has to work with the final ceiling and cabinet plan. We connect those decisions before they become schedule problems.

  1. 01

    Verified appliance and fixture specifications

  2. 02

    Cabinet layout reviewed against field conditions

  3. 03

    Electrical and lighting needs coordinated before walls close

  4. 04

    Finish transitions planned across adjacent rooms

How the work moves

A clear sequence from first review to handoff.

01

Plan the room

We establish the layout, scope boundaries, finish direction, site conditions, and the decisions that need outside design or engineering input.

02

Lock dependencies

Cabinetry, appliances, rough-ins, lighting, ventilation, surfaces, and material lead times are coordinated into a workable sequence.

03

Install and finish

Demolition, rough work, inspections, finishes, cabinetry, surfaces, fixtures, and final corrections move through controlled handoffs.

Common questions

Useful answers before the scope is set.

01

What should a kitchen remodeling budget include?

Review cabinetry, countertops, appliances, demolition, plumbing and electrical changes, flooring, backsplash and installation together. Identify delivery, protection, applicable approvals and owner-supplied items as well. Keeping the layout may reduce some work, but existing conditions and the selected materials still need review before pricing.

02

When will my kitchen be out of use?

The construction plan should identify when appliances, plumbing and work surfaces become unavailable. Cabinet delivery, rough-in work, required inspections and countertop templating affect that period. Discuss temporary cooking arrangements and access before demolition, then confirm the sequence against actual material availability.

03

Can the kitchen layout be changed?

Potentially. A layout change has to account for structure, plumbing, ventilation, electrical service, clearances, and adjacent spaces. We review feasibility before pricing it as an assumed solution.

04

When should appliances and cabinets be selected?

Early. Specifications and cabinet drawings control multiple rough-in locations and final dimensions. Waiting until construction is underway can create delays or compromise the layout.

05

Can you coordinate a kitchen in a condominium?

Yes, subject to the property and association requirements. Building access, work hours, protection, deliveries, insurance documents, plumbing restrictions, and review procedures should be identified before scheduling.