Condo renovation across South Florida.

Renovating a condo means planning both your interior and the building requirements around it. Avi Davi coordinates condo renovations across Broward, Miami-Dade and Palm Beach counties, including Fort Lauderdale, Miami, Miami Beach and Boca Raton, with access, approvals, trades and finishes connected from the start.

Discuss your project Contact Avi DaviInquiries opening soon

What the scope can include

Condo renovation, coordinated beyond the visible finish.

A condo project can involve association review, management procedures, insurance documents, approved work hours, elevators, loading, protection, shutdowns, inspections, and occupied neighbors in addition to the construction itself.

  • Whole-unit and multi-room interior renovation
  • Kitchen, bathroom, flooring, ceiling, millwork, and finish coordination
  • Association and property-management document coordination
  • Elevator, loading, delivery, protection, and debris-removal planning
  • Plumbing, electrical, HVAC, and specialty-trade sequencing
  • Permit and inspection coordination when required
Interiors with room to live.
Avi Davi · Selected gallery

See our work

Interiors with room to live.

Explore kitchens, living spaces, and interior details from Avi Davi’s existing gallery.

View interiors

Planning your own renovation?

Start with the property location, rooms involved, priorities, and target timing. Our preliminary estimator helps frame the conversation; a final proposal depends on the property and agreed scope.

Start my preliminary estimate

Preconstruction focus

Unit decisions and building decisions move together.

Selections and trade scopes cannot be scheduled responsibly until the team understands the building's renovation rules. We identify the applicable review path, access constraints, protection requirements, shutdown procedures, and closeout expectations while the unit scope is being defined.

  1. 01

    Current association renovation rules and management contacts

  2. 02

    Approved work hours, elevator reservations, loading, and parking

  3. 03

    Protection, debris removal, noise, dust, and occupied-neighbor controls

  4. 04

    Required permits, inspections, insurance documents, and closeout records

How the work moves

A clear sequence from first review to handoff.

01

Verify the building

We review the available association or management requirements, access procedures, property constraints, and documents needed before scheduling assumptions are made.

02

Define the unit

The interior scope, selections, trades, rough-ins, protection, approvals, and decision deadlines are organized into one working plan.

03

Coordinate and close

Work advances through controlled access, trade handoffs, inspections when required, daily protection, corrections, cleanup, and building-specific closeout steps.

Common questions

Useful answers before the scope is set.

01

What affects the cost of a condo renovation?

Room count and finishes are only part of the budget. Layout changes, existing plumbing and electrical systems, building protection, elevator access, restricted work hours and debris removal can change the labor and logistics required. Review those items with the association requirements before comparing proposals or committing to finishes.

02

How long will my condo renovation take?

Separate the planning and approval period from time spent under construction. Association review, applicable permits, material lead times, allowed work hours and scheduled inspections all affect the sequence. We establish the working schedule from your unit’s scope and building rules, including any planned utility interruptions and move-in needs.

03

What should a condo owner gather before requesting a proposal?

The association renovation package, management contact, approved work hours, insurance requirements, elevator and loading rules, unit photos, existing plans, and a description of the intended work are useful starting documents.

04

Does association approval replace a construction permit?

No. Association or building approval and municipal permitting are separate processes. The exact requirements depend on the property, jurisdiction, and scope.

05

Can a condo remain occupied during renovation?

Potentially, but the answer depends on the scope, utility interruptions, dust and noise controls, safe separation, building rules, and the resident's tolerance for disruption. Occupancy should be evaluated before the schedule is set.