We review the existing surface, access, dimensions, drainage clues, adjacent improvements, desired use, and the documents available for the property.


South Florida pavers and driveways
Avi Davi Builders coordinates paver and concrete driveways, patios and exterior improvements across Broward, Miami-Dade and Palm Beach counties. From Fort Lauderdale and Wilton Manors to Miami and Boca Raton, the plan connects the finished surface with drainage, access and the conditions beneath it.
What the scope can include
Paver driveways, patios, concrete, fences, pool-area improvements, landscaping interfaces, lighting, and exterior finishes often overlap. A coordinated plan reduces the risk that one finished trade has to be disturbed for the next.

See our work
Explore poolside spaces, exterior lighting, and indoor–outdoor connections in the Avi Davi gallery.
View outdoor livingStart with the location, dimensions, current surface and material preferences. Site conditions and the agreed scope guide the proposal.
Start my preliminary estimatePreconstruction focus
The visible material cannot correct an unresolved slope, utility conflict, access problem, or poor trade sequence. We review where water moves, what must cross beneath the work, how neighboring surfaces connect, and which items should be completed first.
Existing drainage and elevation relationships
Property lines, setbacks, easements, and utility locations
Access for demolition, equipment, deliveries, and concrete placement
Coordination with gates, lighting, irrigation, pools, and landscaping
How the work moves
We review the existing surface, access, dimensions, drainage clues, adjacent improvements, desired use, and the documents available for the property.
Demolition, underground items, layout, base or substrate, forming, inspections, installation, curing, finishes, and restoration are organized in order.
Transitions, gates, landscape interfaces, cleanup, corrections, and final use instructions are addressed before handoff.
Common questions
Some do and some do not. Requirements can depend on the exact scope, property, location, dimensions, drainage, structural work, and local jurisdiction. We identify the applicable path before permitted work begins.
Conduit, sleeves, drainage, footings, posts, wiring, and irrigation may need to cross or sit within the work area. Planning them first avoids cutting or removing a finished surface later.
Send the property address, photos, existing dimensions, desired material and layout changes, and a survey if available. Include known drainage concerns, utilities, gates, landscaping and association rules. Avi Davi uses that information to identify missing details before defining the scope.
Dimensions, demolition and hauling, base preparation, drainage, access, borders, selected material and applicable approvals all affect the price. Confirm whether gates, irrigation, landscape restoration and connections to adjacent surfaces are included. A square-foot rate is useful only when the underlying scope is comparable.
Plan parking and access before demolition. The sequence may include removal, drainage or utility work, base preparation, required inspections and installation. Weather, material availability and the specified curing or setting requirements affect when vehicles can return; the project team confirms that date for the installed system.